About the Cubic Yard Calculator

Topsoil, sand, gravel, mulch and concrete are sold by the cubic yard in the US and by the cubic meter in most other places, so you need the volume before ordering. This cubic yard calculator converts the size and depth of rectangular, round or triangular areas into cubic yards, cubic feet and cubic meters: a 20 by 10 ft area filled 4 inches deep needs about 2.47 cubic yards. Add several areas for one total and estimate the cost at your supplier's price. Depths are easy to get wrong in mixed units, so the calculator lets you enter inches, feet, centimeters or meters directly.

The volume is the area × the depth. A rectangle's area is length × width, a circle's is π × (diameter ÷ 2)², and a triangle's is ½ × base × height. A cubic yard is 3 × 3 × 3 = 27 cubic feet, so divide cubic feet by 27 to get cubic yards; one cubic yard is about 0.7646 m³ and one cubic meter is about 1.308 cubic yards. Suppliers usually deliver in whole or half yards, so round up.

Example: a raised bed or excavation 12 ft long, 10 ft wide and 6 inches deep holds 60 cubic feet, which is 2.22 cubic yards or 1.70 m³. A round area 10 ft across at the same depth holds 39.27 cubic feet, or 1.45 cubic yards. A full-size pickup truck bed carries roughly 2 cubic yards of light material such as mulch, but only about 1 cubic yard of heavy material like gravel or soil.

For weights of gravel and sand use the gravel calculator, for garden beds the mulch calculator and for slabs the concrete calculator. The volume calculator covers spheres, cones and other solids.

How to use the Cubic Yard Calculator

  1. Choose the shapeRectangle, circle or triangle.
  2. Enter the size and depthPick a unit for each measurement.
  3. Set the quantityFor several identical areas, enter how many.
  4. Read the volumeSee cubic yards, cubic feet, cubic meters and cost.

Cubic Yard Calculator features

  • Rectangles, circles and triangles
  • Separate unit for each measurement
  • Cubic yards, cubic feet and m³
  • Multiple identical areas
  • Optional price per yd³ or m³
  • Area shown too
  • Formula with your values

Common uses

  • Ordering topsoil, compost and fill dirt
  • Excavation and trench volumes
  • Raised garden beds
  • Sand for sandboxes and pavers
  • Comparing bulk delivery prices

Volume in practice: earth filling, excavation, skips and trucks, compaction and unit conversions

By the FreeToolsWorld editorial team · Updated November 2026 · How we write and check our guides

Ordering soil, sand, gravel or concrete, or paying for excavation and debris removal, all come down to volume. Pakistani suppliers usually quote in cubic feet, international specifications use cubic metres and American sources use cubic yards, so converting carefully matters. This guide works through raising a plot with earth fill, explains bulking and compaction, and covers excavation, debris removal and the units involved.

Units

One cubic yard is 27 cubic feet, about 0.765 cubic metres. One cubic metre is about 35.3 cubic feet, or 1.31 cubic yards. Converting every quantity to one unit before comparing quotes avoids expensive mistakes, especially when one supplier quotes per truck and another per cubic foot.

A worked example: raising a plot

A plot of 30 × 60 feet needs to be raised 2 feet before construction, a common job called filling. The compacted volume is 30 × 60 × 2 = 3,600 cubic feet, about 133 cubic yards or 102 cubic metres. Loose earth compacts when rolled and watered, so the amount delivered must be larger, often by around 20% or more, roughly 4,300 cubic feet in this case.

Bulking and compaction

Soil and rock expand when dug up, an effect called bulking, so excavated material takes up more space in a truck than it did in the ground. When placed and compacted, it shrinks again. Excavation quotes, debris removal and fill deliveries should state whether volumes are measured in place, loose or compacted.

Excavation for foundations

Digging foundations removes a volume of soil equal to the trench length times its width and depth. Some of it is reused for backfilling and levelling, and the rest must be removed. Planning where excavated soil will go, before digging starts, avoids blocked streets and extra charges.

Debris removal

Renovation produces large amounts of debris, from broken plaster and tiles to old bricks. Estimating the volume, remembering that broken material is bulky, helps decide how many trips or containers are needed. Disposing of debris through licensed collectors, rather than dumping it on empty plots or roadsides, keeps neighbourhoods clean.

Water tanks

Volume calculations also size water tanks. An underground tank 8 × 6 × 5 feet holds 240 cubic feet, and since a cubic foot holds about 28.3 litres, that is about 6,800 litres. Knowing a tank's capacity helps plan for water shortages and the frequency of tanker deliveries.

Round and irregular shapes

For round areas, multiply π by the radius squared and then by the depth. For irregular areas, split them into rectangles and triangles, or take average depths across several points for uneven ground. Rough estimates are usually fine for soil and gravel, as long as some extra is allowed.

Common mistakes

  • Ignoring compaction when ordering fill.
  • Mixing cubic feet, cubic yards and cubic metres.
  • Forgetting that excavated soil bulks up in trucks.
  • Measuring depth in inches but entering it as feet.

Related tools

For concrete volumes, use Concrete Calculator. For gravel and sand, try Gravel Calculator, and for other volume units, Volume Converter.

Raised beds and planters

Raised garden beds and planters need soil volumes calculated the same way. A bed 8 × 4 feet and 1 foot deep holds 32 cubic feet of soil, about 1.2 cubic yards. Bagged soil and compost are often sold in litres, so converting at about 28.3 litres per cubic foot shows how many bags to buy.

Pools and ponds

Pools and ponds are sized by volume to estimate water and treatment chemicals. A pool 20 × 10 feet with an average depth of 4.5 feet holds 900 cubic feet, about 25,500 litres. Chemical doses are usually given per thousand litres, so converting carefully avoids under- or over-treating.

Ready-mix concrete orders

Ready-mix concrete is ordered by the cubic metre, so slabs measured in feet need converting. A slab of 20 × 20 feet, 5 inches thick, holds about 167 cubic feet, roughly 4.7 cubic metres. Ordering a little extra prevents running short in the middle of a pour.

Moving and storage

Volume also helps when moving house or renting storage. Trucks and storage units are described by their interior dimensions, so multiplying length, width and height gives their capacity. Estimating the volume of furniture and boxes, with room for gaps, avoids booking a truck that is too small.

Checking deliveries

When materials arrive by truck or tractor trolley, measuring the load's length, width and average height and multiplying them gives a rough check on the volume received. Comparing this with the invoice protects against short deliveries.

Digging trenches by hand

For small jobs dug by hand, such as trenches for pipes or cables, volume calculations help estimate labour as well as materials. Knowing roughly how many cubic feet a worker can dig in a day in your soil type lets you plan the time a job will take and avoid surprises.

Limits

Volumes depend on accurate dimensions. Compaction and bulking factors vary with the material and how it is handled.

Frequently asked questions

How do I calculate cubic yards?

Multiply length × width × depth in feet to get cubic feet, then divide by 27. An area 10 ft by 10 ft and 1 ft deep is 100 cubic feet, which is 3.7 cubic yards.

How many cubic feet are in a cubic yard?

27, because a yard is 3 feet and 3 × 3 × 3 = 27. To convert cubic feet to cubic yards, divide by 27; to convert yards to feet, multiply by 27.

How do I convert inches of depth to yards?

Divide the depth in inches by 12 to get feet, then use feet in the formula. 4 inches is 0.333 ft, so 100 sq ft at 4 inches deep is 33.3 cubic feet, or 1.23 cubic yards.

How much area does a cubic yard cover?

324 square feet at 1 inch deep, 108 square feet at 3 inches, 81 square feet at 4 inches and 54 square feet at 6 inches. Divide 324 by the depth in inches.

How many cubic meters are in a cubic yard?

One cubic yard is 0.7646 cubic meters, and one cubic meter is 1.308 cubic yards. So 10 cubic yards is about 7.65 m³.

How much does a cubic yard of dirt weigh?

Roughly 2,000 to 2,700 lb (0.9 to 1.2 tonnes), depending on the soil type and moisture. Wet clay is at the heavy end, dry topsoil with organic matter at the light end.

How many cubic yards fit in a pickup truck?

A full-size pickup bed holds about 2 to 3 cubic yards by volume, but heavy materials limit it to around 1 cubic yard of soil or gravel because of the payload rating.

Should I order extra material?

Add about 5 to 10% for uneven ground and settling, and more for soil that will be compacted. Suppliers typically sell in half or whole yards, so round up to the next unit they offer.